Camtek Software

The Welding Trifecta

Plenty of shops buy a welding robot and are disappointed by what it does to their output. The robot is rarely the problem. It welds quickly and consistently, and it does not get tired.

What limits the cell is everything around the robot. Three things have to line up, and if any one of them is slow, the other two wait.

One: generate the fixture from the solid model

The part already exists as a CAD model. The fixture that holds it is derived from that model — the contours it must cradle are the underside of the part, and nothing else.

Constructing that by hand is skilled, slow work, and it is the step that most often holds a job up. Generating it from the model instead removes the bottleneck rather than speeding it up. This is what Nucleo does, and it is covered in more detail in where the time goes.

Two: program away from the robot

A robot that is being taught is a robot that is not welding. Every hour spent at the pendant is an hour of lost cell capacity, and on a busy cell that is the most expensive hour in the building.

Offline programming moves that work away from the machine. The cell keeps running on the current job while the next one is prepared. Teaching at the pendant remains available for touch-up and for jobs too simple to be worth simulating — the point is having the choice, not banning the pendant.

Three: load the part quickly and identically

This is where a generated fixture pays off a second time. A cradle derived from the part model locates the component in one position and only one position. The operator drops the part in, it seats, and they press cycle start.

There is no measuring, no clocking in, no judgement call about whether it is sitting right. Repeatability moves from the operator’s skill to the fixture’s geometry — which is the only place it can be relied upon shift after shift.

Why all three, and not just one

The three compound, and that is the whole argument.

Fast fixtures with pendant programming still leave the cell idle while somebody teaches it. Offline programming with slow fixtures leaves the robot waiting weeks for tooling. Both solved, but a fixture the operator has to fight, and you lose the gains one part at a time.

Get all three and the robot finally runs at something like its rated capacity. That is usually when shops discover the constraint has moved somewhere else entirely — which is the right problem to have.


Next: where the time goes in fixture design · what a welding fixture actually costs

WhatsApp